During the work on the LBA and HBA, there was a parallel task of establishing the network connections. These are for within the RF-container itself, but also between the RF-container and the main Observatory building.
Caption : Klaas Stuurwold takes some notes during the network set-up process.
Yes... this does look familiar! http://kaira.sgo.fi/2012/07/setting-up-networks.html
ReplyDelete