in the RF-container commenced on time and proceeded swiftly. The first
step was to install the sub-rack assemblies into the container. These
contain the bulk of the signal processing electronics.
Caption 1 : The observatory van arrives with another load of
electronics.
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEhSpAytZ2KkJ75KKmvpHGiDG2xSshZ9h4kiEVPXa-STMKcQuxnlUekeXfDj6eLTv0cJ508rD0z2YhNmnkwn_Qy0xmOXwPgywT9hLM28SWcreyrhx2DXGJ_i-JvMauLeHp8DH-auS98SLLhz/s320/elec_01.jpg)
Caption 2 : Tonjes Jipping and Peter Gruppen manhandle one of the
sub-rack assemblies out from its crate and into the RF-container for
installation in the rack frames.