in the RF-container commenced on time and proceeded swiftly. The first
step was to install the sub-rack assemblies into the container. These
contain the bulk of the signal processing electronics.
Caption 1 : The observatory van arrives with another load of
electronics.

Caption 2 : Tonjes Jipping and Peter Gruppen manhandle one of the
sub-rack assemblies out from its crate and into the RF-container for
installation in the rack frames.

No comments:
Post a Comment